Technical approval of the work done
 				| 1) Main highway Risan – Žabljak, section Dragalj Polje – Grahovo, l=7km | 
      
	
	Besides this, the representatives of SIMM Engineering, participated as members of the committee, for traffic phase, for technical receipt of works of the following:
 				| 2) Reconstruction of the main highway M2, section Podgorica-Kolašin, sites: | 
      
	
	- Mioska, l=0.70km
	- Dubravice, l=1.03km
	- Dubravice-Seoca 1, l=1.03km
	- Seoca 1 – Seoca 2, l=1.10km
	- Seoca 2 - Dolovi, l=0.88km
	- Dolovi-Crkvine, l=1.25km
	- Bablja greda, l=0.54km
 				| 3) Residential building on Urban Plot 12, in  urban block 3, in the area of  Detailed Urban Plan „Blok 6, Kruševac“ – amendments in Podgorici |